|
BMWF #2: Upper South Fork Sun River
| Type of Project: |
backpacking, trailwork |
| Rating: |
moderate |
| Trip Dates: |
06/14/2010 to 06/19/2010 |
| Location: |
Rocky Mountain Front |
| Work: |
This project is our first backcountry, overnight project to kick off the season. The focus of the work on this trip is erosion control! We’ll work to keep the dirt on the trail and the water in the river to enhance water quality and trail longevity. The crew will be replacing a small bridge and culvert, installing small drain dams, and restoring any washouts from spring runoff. That means the chance to learn some technical skills building structures, maintaining and installing drainage, with each day’s work building on the previous, with hikes to the worksites varying from 2-6 miles/day. BMWF will coordinate pack stock support to transport tools and food into the backcountry, but volunteers should be prepared to carry their personal gear. Once you submit your registration to BMWF, you will receive more detailed project information including a suggested packing list and driving directions.
This is a backcountry camping trip with primitive campsites. BMWF will coordinate pack support to bring in tools, food, group gear and maybe some personal gear. You will be asked to provide your own gear and assist in camp chores. Sturdy boots, long pants and work gloves are required. All tools, safety gear and food will be provided. |
| Total Miles: |
8 |
| Elevation Gain: |
+1300 |
| RSVP: |
PROJECT IS FULL |
Back to Main Trip List Page
|